Journal of Sustainable Development of Transport and Logistics
journal home page: https://jsdtl.sciview.net
Shakir, M. K., Khurshid, M. B., Iqbal, J., &Adeel, M. (2018]. Multicriteria Decision Making (MCDM) for evaluation of different transportation alternatives: A case of Rawalpindi bypass Pakistan. Journal of Sustainable Development of Transport and Logistics, 3(3), 38-54. doi:10.14254/jsdtl.2018.3-3.3.
Scientific ~Platform
ISSN 2520-2979
Multicriteria Decision Making (MCDM) for evaluation of different transportation alternatives: A case of Rawalpindi bypass Pakistan
Malik Kamran Shakir 1 , Muhammad Bilal Khurshid2, Jawed Iqbal3 , Muhammad Adeel 2
1NUST Institute of Civil Engineering, School of Civil & Environmental Engineering (SCEE), National University of Sciences & Technology (NUST), Islamabad, Pakistan, Department of Civil Engineering
2Military College of Engineering, National University of Sciences & Technology (NUST) Islamabad, Risalpur Campus, KPK, Pakistan-24080 Department of Transportation Engineering
3National Institute of Transportation, National University of Sciences & Technology (NUST) Islamabad Department of Transportation Engineering
OPEN ^^ ACCESS | d
Article history:
Received: December 12,
2017
1st Revision: September 07,
2018
Accepted: November 29, 2018
DOI:
10.14254/jsdtl.2018.3-3.3
Abstract: Safe, efficient and user-friendly transportation of people and goods have been a premier point of concern for all the developed and the developing countries around the globe. National Highway N-5 or GT road is the most important highway link in Pakistan. It carries about 80 % of the country freight traffic. When this heavy traffic passes through the twin cities of Rawalpindi and Islamabad, it causes congestion and environmental hazards particularly in business centers of Rawalpindi city. Because of this heavy traffic volume passing through the cities situated along N-5, bypasses to all of them have been provided however, Rawalpindi is the only city along N5 which is still without a bypass. A bypass to Rawalpindi city is, therefore, inevitable. Besides this, the Bypass will also provide a short access to the traffic on the Motorway (M2) destined for the western part of Rawalpindi. For this research work, Rawalpindi Bypass is taken as a hypothetical scenario and is evaluated for its benefits. Besides addition to the networks of highways across Pakistan, this bypass has many other benefits which include a decrease in congestion from Islamabad and Rawalpindi main arteries (ISB Highway and IJP Road) that results in travel time savings, vehicle operating cost savings, safety savings, and reduced air pollution. This research aims to produce an engineering and scientific comparison of various costs and benefits associated with the road agency and users about the construction of an alternative. The Project involves transportation demand estimation on different segments of the National and Arterial roads, Project Costs, travel time savings, safety saving, vehicle operating cost savings, economic efficiency analysis, Air quality impact and multi criterion transportation decision making. The transportation decision making process usually involves the evaluation of effectiveness and efficiency of an alternative decision
Corresponding author: Malik Kamran Shakir E-mail: [email protected]
This open access article is distributed under a Creative Commons Attribution (CC-BY) 4.0 license.
with respect to a base case DO-NOTHING Scenario. The authors have taken the existing roadway structure with no improvements as DONOTHING Scenario, whereas the construction of Rawalpindi Bypass (60 km) with 2 lanes in each direction is taken as Alternative B and Rawalpindi Bypass (51 km) as Alternative C. Multi criteria decision making technique is used for decision because of multiple options with different dimensions, both monetary and non-monetary. Basing of MCDM this study recommends Alternative C (51 km) for Rawalpindi Bypass.
Keywords: Rawalpindi bypass, multi criteria decision making, travel time savings, safety savings, vehicle operating cost savings, air quality impact.
1. Introduction
The core of transportation decision making is the evaluation of transportation projects and programs in the context of available funding. For this reason, the principles and procedures of transportation project evaluation and programming are of interest to transportation engineers and planners, transportation agency administrators, facility managers and service providers, environmental groups and the general public. This is a critical issue for governments everywhere. Each year, several trillions of dollars are invested worldwide in transportation facilities with a view to enhancing transportation system mobility, security, and safety, and to spurring economic development while minimizing environmental and other adverse impacts. Same is the case within Pakistan. In most countries, the sheer size of existing transportation assets and investment levels, coupled with the multiplicity of transportation system impacts and stakeholders, necessitates a comprehensive, yet integrated and consistent approach to evaluating such impacts. The new millennium is characterized by continued growth in commercial and personal travel demand, and transportation agencies and providers strive to keep their assets in acceptable condition so as to offer desirable levels of service in the most cost-effective manner and within available resources. Consistent with such efforts is the need for best-practices evaluation and monitoring of the expected impacts of alternative investment decisions, policies, and other stimuli on the operations of existing or planned transportation systems and their environments.
The 24 hrs traffic counts at Rawat along N5 in 2003 were more than 22,000 vehicles and in year 2015 it increased to more than 50,000 according to the survey of national highway authority Pakistan. It is because of this huge amount of traffic passing through the cities situated along N-5 that bypasses to all of them have been provided. Rawalpindi is the city still without a bypass. More than 6,000 trucks pass through the city in 24 hours. This volume of truck traffic seriously affects environment of the city. A bypass to Rawalpindi city is, therefore, inevitable. Besides this, the Bypass will also provide a short access to the traffic on the Motorway (M2) destined for the western part of Rawalpindi. Enroute, the Bypass will connect, Rawat-Chakbeli road, Adyala Road and Chakri Road in Rawalpindi and Tarnol-Fatehjang road in Islamabad. Absence of bypass results in mixed traffic, traffic Congestion, grid locks, environmental hazards (noise and air pollution) and traffic safety issues. During study, it was revealed that the intra city traffic is compelled to pass through the city of Islamabad and Rawalpindi and this traffic combined with the local slow-moving vehicles results in high traffic congestion and traffic management problems usually on IJP road Rawalpindi and Islamabad expressway. The provision of Rawalpindi bypass will help reduce the traffic pressure in twin cities. The main objectives of this research work are to find the best alternative for Rawalpindi Bypass in term of construction cost and user benefits by carrying out multi criteria decision making (MCDM). The Project involves Project Cost estimations of Rawalpindi Bypass, travel time savings, safety saving, vehicle operating cost savings, economic efficiency analysis, Air quality impact and multi criterion transportation decision making. Existing road way structure with no improvements taken as DO-NOTHING Scenario, whereas the construction of Rawalpindi Bypass (60 km) with 2 lanes in each direction is taken as Alternative B and Rawalpindi Bypass (51 km) as Alternative C. Existing scenario shows the existing traffic pattern distributed along the N5 and Islamabad highway. Heavy traffic which is coming from Punjab cities and
from Peshawar uses N5, at Pirwadai flyover the heavy traffic is diverted towards IJP road and from Faizabad interchange the traffic it diverts onto Islamabad Highway. Figure 1 is showing existing or donothing scenario.
Figure 1: Existing Scenario / Do nothing scenario
For alternative 1 the start point of Rawalpindi Bypass project is 5 km short of Rawat, which is an important junction on the N-5 and terminates at Nicolson Monument Islamabad at junction of N5. Total length of alignment is 60 km. Figure 2 is showing alignment # 1
Figure 2: Alignment # 1 for the proposed Rawalpindi Bypass (60 km)
For Alternative # 2 the start point of Rawalpindi Bypass project is 1 Km short of Rawat, which is an important junction on the N-5 and terminates at sector B17 Islamabad at junction of N5. Total length of alignment is 51 km. Figure 3 showing alignment # 2.
Figure 3: Alignment # 2 for the proposed Rawalpindi Bypass (51 km)
1.1 Travel Time Savings
Enhancements to a transportation system are often expected to yield increased travel speed or decreased waiting or transfer times, and consequently, reduced travel time. The savings associated with reduced travel time typically constitute the largest component of transportation user benefits. In this part of research study is been carried out on issues associated with travel time as a transportation performance measure and methodologies for the assessment of travel-time amounts and unit monetary values for the purpose of evaluating the travel-time impacts of transportation projects. Given that the values of travel time vary by certain attributes of the trip and the trip-maker, it is important to establish the travel-time amount. The overall framework for assessing travel-time impacts involves the estimation of travel-time amounts, travel-time values, and overall savings in travel-time costs.
1.2 Safety Savings
Transportation projects generally have a direct or indirect safety component that reduces the rate or severity of crashes. As such, safety enhancement is considered a key aspect of user benefits associated with physical or policy changes in a transportation system. The economic cost of transportation crashes, which is borne by individuals, insurance companies, and government, consists of loss of market productivity, property damage, loss of household productivity and workplace costs. The most basic unit for measuring transportation safety is a crash. A crash can be defined as a collision involving at least one moving transportation vehicle (car, truck, plane, boat, railcar, etc.) and another vehicle or object. Transportation crashes are typically caused by factors such as driver, pilot, or operator error, mechanical failure, and poor design of the guide way, roadway, waterway, or runway. A crash can also involve non- collision off the transportation path, such as a vehicle rollover. Engineering factors involved in a road crash are as shown in Figure 4.
Figure 4: Engineering Factors of Highway Transportation Crashes
Engineering Factors
Carriageway
Median
Exposure
> Alignment
> Shoulder
Roadside Features
Lane width, pavement surface type, pavement friction Median width and type )> Section length, section traffic volume
> Vertical slope and sight distance, horizontal sight distance and curve characteristics
-7- Shoulder type, shoulder width, shoulder rumble strips
Side slopes, ditches, obstructions (fences, road signs, etc.), utility poles
Traffic Control Devices Pavement markings, road signs, etc.
Technology -^ Rxed infrastructure or in-vehicle cautionary or guidance devices
Source: Reprinted from Transportation Decision Making: Principles of Project Evaluation and Programming (P. 103) by Sinha, C Kumares, Samuel Labi, 2007, John Wiley & Sons. Inc.
1.2.1 KABCO Scale
KABCO Injury Scale Established by the American National Standards Institute, the KABCO injury scale (Table 1) is designed for police coding of crash details at a crash scene. The coding does not require medical expertise the police officer at the crash scene assesses the sustained injuries and assigns a code depending on the level of severity. The KABCO system has faced some criticism because it does not always classify injuries classification in a consistent manner (e.g. the code assigns equal severity to a broken arm and a severed spinal cord). Therefore, in a bid to reduce the variability in reporting, the National Highway Traffic Safety Administration (NHTSA) wish to use another scale rather than KABCO scales to describe transportation injuries. But for our project we have used KABCO scale.
Table 1: KABCO Scale for Crash Severity
Code Severity Injury Description
K Fatal Any injury that results in death within 30 days of crash occurrence
A Incapacitating Any injury other than a fatal injury which prevents the injured person from walking, driving, or normally continuing the activities the person was capable of performing before the injury occurred (e.g., severe lacerations, broken limbs, damaged skull)
B Injury evident Any injury other than a fatal injury or an incapacitating injury that is evident to observers at the scene of the crash in which the injury occurred (e.g., abrasions, bruises, minor cuts)
C Injury possible Any injury reported that is not a fatal, incapacitating, or nonincapacitating evident injury (e.g., pain, nausea, hysteria)
O Property damage only Property damage to property that reduces the monetary value of that property
Source: https://safety.fhwa.dot.gov
1.3 Vehicle Operating Cost (VOC) Savings
Vehicle costs are direct expenses that comprise the costs of vehicle ownership (fixed) and vehicle operation (variable). The latter category, typically referred to as vehicle operating costs (VOC's), varies with vehicle use and is typically expressed in cents per mile traveled by a vehicle. For most transportation modes, VOC involves energy use, tires, maintenance, repairs, and mileage dependent depreciation (Sinha et al, 2008). Fixed vehicle costs are those that are largely independent of vehicle use and are generally unaffected by transportation improvements; examples are insurance costs, time
dependent depreciation, financing and storage. Such costs are therefore typically excluded from VOC impact evaluation of projects. VOC savings or benefits of a transportation improvement or intervention simply refer to the reduction in vehicle operating costs compared to an existing situation or a base-case alternative. For area wide or corridor-level projects involving multimodal systems, an improvement in any part of the system can affect VOCs of the other parts or other modes. For example, service improvement in commuter rail or provision of a bus rapid transit along a corridor can affect the level of service on highway facilities in the same corridor because the shift of some travelers from automobile to transit would lead to improved highway level of service due to reduced congestion and thus, lower vehicle operating costs at the highway section. Figure 5 shows the factor affecting VOC (Sinha et al., 2008).
Figure 5: Factors Affecting Highway Vehicle Operating Cost
Average Speed Average Delay Number of Speed Changes
Source: Sinha et al, 2008
1.3.1 Hepbrun Model
Hepburn developed a VOC model in 1994 for urban roadways that considers the sum of four VOC components (tires, vehicle depreciation, maintenance, and fuel) as a function of two VOC factors: speed and vehicle class. The model is particularly useful for evaluating VOC impacts of transportation interventions that mostly yield a change in average operating speeds or policies that cause a shift in vehicle class distribution. The Hepburn function is as follows (S Hepburn, 1994):
For "low" average travel speeds (< 50 mph):
D
VOC = C + -
For "high" average travel speeds (> 50 mph):
VOC = a0+ a^S + aS2
where VOC (cents/mile),
S - speed (mph)
and C, D, a0, a1,and a2 are coefficients that are functions of vehicle class.
1.4 Air Quality Impact
Transportation or "mobile" sources of air pollution, particularly motor vehicles, are a primary source of local carbon monoxide problems and are considered the main cause of excess regional
photochemical oxidant concentrations. Transportation vehicles typically emit carbon monoxide, nitrogen oxides, small particulate matter, and other toxic substances that can cause health problems when inhaled. Air pollution also has adverse effects on forests, lakes, and rivers. The contribution of transportation vehicle use to global warming remains a cause for much concern as anthropogenic impacts on the upper atmosphere become increasingly evident.
Airports, for instance, are a major source of local violations of ambient carbon monoxide standards and contribute to regional photochemical oxidant problems. In the current era, rail travel is increasingly being powered by electricity and is therefore typically not associated with significant air pollution, except in cases where the source of rail energy generation is associated with significant pollution, such as coal-based electrical power generation.
1.5 Multi Criterion Decision Making
In multi criteria decision making, a key step is the explicit or implicit assignment of relative weights to each performance criterion (Ling Xu et al, 2001) to reflect its importance compared to other criteria; for example, to what extent is safety improvement more important than travel-time reduction, increase in facility condition, vehicle operating cost decrease, increased economic development, improved aesthetics, and so on? The following methods can be used to establish the weights:
• Equal Weighting
• Direct Weighting
• Regression-Based Observer-Derived Weighting
• Delphi Approach
• Gamble Method
• Pairwise Comparison
• Value Swinging.
1.5.1 Pairwise Comparison of the Performance Criteria:
Pairwise comparison is the technique used in this study to establish weights for the performance criteria. Weighting can be carried out using pairwise comparison of performance criteria, and a common tool for doing this is the analytical hierarchy process (AHP). AHP establishes the weights of performance criteria by allowing the survey respondent (decision maker) to consider objective and subjective factors in assessing the relative importance of each criterion (Saaty, 1977). Using AHP, decision makers can develop weights that reflect their experience and knowledge in a natural and intuitive manner. In AHP, complex structures representing performance criteria are organized in hierarchical clusters facilitate pairwise comparisons between the criteria at each hierarchical level to estimate their relative weights. Pairwise comparisons between two performance criteria i and j can be represented by using the reciprocal matrix:
aij = aik x akj, for i, j =1,2,...,n
Such situations, which may result in the development of an inconsistent reciprocal matrix, generally arise when the entries aij are based on subjective judgments of the survey respondents (decision makers) rather than on exact measurements. As a result, the relationship is modified as follows:
Aw = Xx w
Where A is a set of eigenvalues of the matrix A such that £ Ai = n.
When the relationship in equation holds and the reciprocal matrix is perfectly consistent, all the eigenvalues (Ai) are zero with the exception of one which is equal to n (the largest eigenvalue of the matrix in this scenario). On the other hand, when the reciprocal matrix is inconsistent (due to subjectivity of judgments), the largest eigen value, Amax, is close to n, and the remaining eigenvalues are close to zero. Under these circumstances, to determine a unique set of relative weights, a vector w has to be found that satisfies the following relationship:
Aw —
■ x w
The relative weights are computed as the components of the normalized eigenvector associated with the largest eigen value of their comparison matrix. The eigen vector of the reciprocal matrix can be computed using vector algebra, numerical methods to yield the relative weights (Ling Xu et al, 2001).
Consistency checks, an important step in AHP, assess the degree of randomness in the judgments used to develop the reciprocal matrix. The deviation of Amax from n is used as a measure of the consistency with the reciprocal matrix developed (Ling Xu et al, 2001). The logical consistency of the pairwise comparisons can be measured using the consistency index (CI), which is defined as:
„„ _ d _ ^max — n
~ RI~ (n- 1)
The consistency index is then compared with the average consistency index of randomly generated reciprocal matrices (referred to as the random index, RI) to determine the level of inconsistency in the survey responses. Table 3 shows the random indices for matrices of order 1 through 10 (Saaty, 1994).
Table. 1: Relationship between Matrix Order and Average Random Index
Order of matrix (n)
Average Random Index
1 0.00
2 0.00
3 0.58
4 0.90
5 1.12
6 1.24
7 1.32
8 1.41
9 1.45
10 1.49
The overall consistency of AHP judgments can be determined using the consistency ratio (CR), which is computed as follows:
„D CI ^max n Ln — ——■ —
RI (n-1)(RI)
A consistency ratio of 0.1 or lower is considered acceptable (Saaty, 1994). If the ratio exceeds 0.1, then the judgments are considered random and the reciprocal matrix should be recomputed. In summary, the AHP process for weighting involves the following steps:
1. Constructing a pairwise comparison matrix
2. Estimating the value of the eigenvector that reflects the relative weights
3. Checking for consistency AHP can also be used to synthesize judgments and estimate priorities for alternatives.
2. Research Methods
Multiple criteria decision making (MCDM) refers to making decisions in the presence of multiple, usually conflicting, criteria. MCDM problems are common in everyday life. The authors have evaluated project cost, travel time benefits, safety benefits, vehicle operating cost benefits and reduced emissions. Based on these performance criteria different alternatives are evaluated and then a better alternative is selected through multi criteria analysis.
2.1 Cost Estimation
The second part and the most important part of our assigned project is the cost estimation. The cost for alternatives is calculated using the engineer's estimate of E35 Hasanabdal to Havelian while following the NHA CSR 2011 specifications. All the costs are calculated as an average cost after considering the costs of E35 Hasanabdal to Havelian expressway. Table 2 shows the aggregate costs of
different categories of road construction. All costs are converted to the year 2015 using CPI indices i.e. CPI2011= 202.32 &CPI2015=233. Two Interchanges data were used for the estimation of cost of Interchanges on the proposed Alignment. Those interchanges were Zero Point Interchange which was completed in year 2011 and Faizabad Interchange which was constructed in the year 1998. Their construction cost was taken as in the relative year of its completion. Table 4 is showing the aggregate costs of each construction activity.
Table 2: Aggregate Costs
Type of Construction/ Structures Cost 2011 (Rs. Millions) Cost 2015 (Rs. Millions) Units
Pavement Construction 37.00 42.55 Per Lane per km
Interchanges 2395 2755 Per Interchange
Toll Plazas & Weight Stations 115.00 132.25 Per Toll Plaza
Bridges 1.760 2.024 Per Linear Meter
Underpasses 1.050 1.20 Per Linear Meter
Ancillary Works 5.8 0 6.67 Per Lane per km
Structures (Culverts/Retaining Walls and 12.700 14.605 Per Lane per km
Drainage & Erosion Works
Proposed Rawalpindi Bypass Cost Estimation
Using Table 3 costs for proposed alignments for Rawalpindi Bypass have been calculated. Proposed alignments are 2 lanes on each side. The lengths and other characteristics of alignments are shown in Table 3. Table 3 and 4 are showing overall construction costs of both alignments. Total cost for proposed bypass is divided into two main categories i.e. land acquisition and road construction cost.
Table 3: Proposed Alignment # 1 (60 Km)
_Road Construction_
Pavement Construction cost per Structures Cost Total Length Total Cost (2015)
km (Rs. Millions) (km) (Rs. Millions)
_(Rs. Millions)_
(2011) (2015) (2011) (2015)
222_255.3_10997_12646_60_27964
_Cost of Acquiring Land_
Avg Cost per Kanal Land to be acquired (Kanal) Cost
(Rs. Millions)___(Rs. Millions)_
_0.8_11869 9495
Total Cost (2015) 9495+27964 Contingencies @ 3 % of Total Cost = Escalation @ 6.5 % of Total Cost = Total Cost in Year 2015
Rs. 37.459 Billions Rs. 1.12 Billions Rs. 2.43 Billions Rs. 41.00 Billions
Table 4: Proposed Alignment # 2 (51 Km)
_Road Construction_
Pavement Construction cost per Structures Cost Total Length Total Cost (2015)
km (Rs. Millions) (km) (Rs. Millions) _(Rs. Millions)_
(2011) (2015) (2011) (2015)
222 255.3 8522.5 9800 51 22820
Cost of Acquiring Land
Avg Cost per Kanal (Rs. Millions) Land to be acquired (Kanal) Cost (Rs. Millions)
0.8 10089 8070
Total Cost (2015) 8070+22820 Rs. 30.89 Billions
Contingencies @ 3 % of Total Cost = Rs. 0.92 Billions
Escalation @ 6.5 % of Total Cost = Rs. 2.00 Billions
Total Cost in Year 2015 Rs. 33.81 Billions
3. Analysis and Results Discussion 3.1 Travel Time Benefits
For travel time benefits a present case scenario (existing situation) and an alternative scenario (transportation improvement due to intervention) are taken for analysis purposes. Currently, 56500 vehicles pass through N5 that includes 70% non-commercial and 30% commercial vehicles. The commercial vehicles that are mostly the trucks are diverted to IJP road which passes through Faizabad Interchange joining the Islamabad Expressway and travel to Rawat. In bypass case scenario out of total AADT 17,000 which includes 9000 Trucks and 8000 cars are diverted on bypass while the rest is traveling on the existing route. There will be no trucks traveling on the existing routes as all the trucks are diverted on bypass. The existing road is divided into numbers of sections. Travel time before and after intervention. HCM method is used for calculations of speed. These calculations are made after making some assumptions about free flow speed for different segments taken for analysis. The unit travel time costs are converted to year 2015 using CPI index for year 2014 & 2015. Unit travel time cost for cars is taken as 320 PKR and for trucks PKR 222. For travel time savings equation from HCM is used. Detail results are shown in Figure 6.
Figure 6: Travel Time Savings
m K
I.
m co __«I
I i
TRAVEL TIME BEFORE TRAVEL TIME ON TRAVEL TIME SAVING INTERVENTION RAWALPINDI BYPASS
Travel Time Savings = (Occupancy of Vehicle) X (AADT X Travel Time Saved) X (Unit Travel Time
Cost
From the analysis, it is concluded that 29.38 Mins per vehicle can be saved after the intervention. Now using the unit travel time cost for both car and trucks the total Monterey benefit was calculated which is PKR. 2.535 Million per day or PKR 923.5 Million per year.
3.2 Safety Savings
The World Health Organization has recognized the seriousness of traffic accidents in terms of fatalities, personal injuries and property damage as a social and public health problem. Transportation Projects either directly or indirectly reduce the crashes rates or severity. Enhancing the safety is considered as a key user benefits pertaining to the physical or policy changes in transportation system.
(Fatal Crashes + Non- fatal Crashes) Before intervention - (Fatal Crashes + Non- fatal Crashes) After intervention
Equation 3 is used to calculate total numbers of crashes saved after intervention. The Number of Fatal and Non-Fatal Crashes are calculated in for all of the above sections of highway taken for analysis purpose. Both rates are calculated by keeping in view without intervention & with intervention scenario of RWP Bypass. The result of analysis is shown figure 7 below. The costs for fatal and nonfatal crashes
are taken from iRAP - International Road Assessment Program which are as under. Using these costs total savings are calculated and results are shown in figure 8. It has been observed that after intervention PKR 291 Million can be saved per year as the no of fatal and non-fatal crashes are reduced.
True Cost of Road Crashes
• Fatality - 70 times GDP per capita
• Injury - 18 times GDP per capita
For Pakistan:
• Per capita income of Pakistan - $1250
• Fatal Crash - $87,500 (aprox. Rs.100,00,000.00)
• Injury Crash - $22,500 (aprox. Rs.2,500,000.00)
Figure 7: Crash Rate Savings
■ No of Crashes (First Year) Fatal ■ No of Crashes (First Year) Non Fatal
m
Ol
BEFORE INTERVENTION
AFTER INTERVENTION
ON RAWALPINDI BYPASS
TOTAL CRASHES REDUCTIONS
Figure 8: Total Crash Cost Savings per year (Rs. Millions)
FATAL NON FATAL TOTAL
3.3 Vehicle Operating Cost
For the calculation of vehicle operating cost Rawalpindi bypass was considered as a case study. Rawalpindi by pass is supposed to be constructed to divert the traffic on N-5 from Taxilla to Rawat directly. The bypass will be 60 kilometers two-lane divided highway with grade separated roads on the intersections. Before the construction of bypass, the vehicles travel via two routes from Rawat to Taxila. These two routes directly pass through the city of Rawalpindi thus creating a lot of congestion on roads and increasing the vehicle operating cost. The vehicle operating cost calculation (VOC) was done by using the Hepburn model (Comsis,1999). The model considers speed and vehicle characteristics for the calculation of VOC. The Hepburn model is used for the calculation because the routes for which VOC is to be calculated has different variation of speed sections. After applying the methodology VOC before the intervention is first calculated. Results are shown in figure 9. The speed used for calculations was calculated using COMSIS method. The VOC savings are calculated using equation mentioned below
VOC User Saving = [Principal Arterial w/o Intervention] - [Principal Arterial with Intervention + Expressway/Bypass]
30000 25000 20000 15000 10000 5000 0
3.4 Air Quality Impact
In evaluating the impact of transportation improvements on air quality, the first step is to estimate the change in emissions as a result of changes in the average speed of vehicles, increases in motor vehicle trips, and increases in VMT due to these improvements (Williams, 2007). The second step is to determine the resulting change in pollutant concentrations due to the change in emissions. Total reduced emissions are calculated by using the equation.
Reduced Emissions = (Emissions before Interventions) - (Emissions on Existing Route with Bypass + Emissions on Bypass
Figure 10: Reduction in Emissions after intervention Reduced Emissions in Kg/Year
120000000 100000000 80000000 60000000 40000000 20000000 0
-20000000
Figure 9: VOC Savings (PKR. Millions)
24818
VOC before VOC after VOC on bypass VOC Savings
Interventions on Interventions on exi sti ng route exi sti ng route
109164199,2 109644717,4
50941,83181 VOC
575949,206
CO NOx
-146372,905
CO2
Total Reduction in Emissions
4. Multi Criteria Decision Making (MCDM)
Multiple criteria decision making (MCDM) refers to making decisions in the presence of multiple, usually conflicting, criteria. MCDM problems are common in everyday life. Author have evaluated project cost, travel time benefits, safety benefits, vehicle operating cost benefits and reduced emissions. On the basis of these performance criteria we have different alternatives and then we select which one is better through multi criteria analysis. After all performance criterions have been weighted and scaled, the challenge remains to combine the impacts for each alternative. In this amalgamation step an appropriate operation is used to yield a combined level of desirability for each alternative so that the best choice can be identified. Several tools and techniques are employed for amalgamation such as mathematical value, or utility functions rating and ranking and cost effectiveness. Figure 6 is showing the steps followed by author for MCDM. The key Performance criteria which author have used for MCDM are, project initial, travel time saving, safety, vehicle operating, crash rate savings cost in Millions Rs while air quality impact as reduced emissions in Mg. It is sought to use Analytical Hierarchy Process to assign relative weights to all the above key performance criteria. Pair wise comparison matrix is obtained by taking survey. The survey involves different questions asked from professionals about their perception of importance of these mentioned criterions.
T able 5: Pair wise comparison matrix
Project Cost TT Saving Crash Savings VOC Savings Reduced Emission
Project Cost 1 3 1/2 5 3
TT Saving 1/3 1 1/3 2 1/3
Crash Rate 2 3 1 5 5
Savings
VOC Savings 1/5 1/2 1/5 1 1/5
Emission 1/3 3 1/5 5 1
The above matrix has shown that Crash Savings is the most important criterion among all other criterions. After crash rate project cost, travel time, reduced emissions and VOC savings are taken.
Where 1 Refers to Criterion X is Equally Important to Criterion Y, 1/5 Refers to when Criterion X is Strongly less Important than Criterion Y, 1/3 Refers to when Criterion X is Moderately less Important than Criterion Y, 1/2 Refers to when Criterion X is slightly less Important than Criterion Y, 5 Refers to when Criterion X is Strongly More Important than Criterion Y, 3 Refers to when Criterion X is Moderately More Important than Criterion Y and 2 Refers to when Criterion X is slightly More Important than Criterion Y. The normalized weights of each criterion are given below.
I Table 6: Normalized Weights 1
Performance Criterion Normalized Weights
Project Cost 0.2722
TT Saving 0.0951
Crash Rate Savings 0.4107
VOC Savings 0.0531
Emission 0.1689
After normalized weights obtained now consistency check is applied to check the randomness of the matrix using equation given below
A*w = Amax * w
The Eigen vector (w) corresponding to the eigen value Amax in the above matrix equation is given
as;
W =
0.2722 0.0951 0.4107 0.0531 0.1689
The Consistency ratio is then determined using the equation below and it is observed that the consistency ration is 0.082 which is less than 0.1 so it is acceptable.
Scaling is used to Establishment of common unit or scale of measurement so that all performance criterions can be express in commensurate units. Risk scenario method is used for scaling (Certainty Equivalent Approach). The levels for each criterion is taken from bypass calculations relative to each alternative and shown in table 7.
1 Table 7: Savings Criteria Levels for Each Criterion 1
Criteria Level as Per Alternative
Alternative Project Cost (Rs. Millions) TT Savings (Rs.Millions) Crash Rate Savings (Rs.Millions) VOC Savings (Rs.Millions) Reduced Emission (Tons)
A (Do Nothing) 0 0 0 0 0
B (60 km) 41000 923.45 291.25 1060.56 109644
C (51 km) 33800 1022 346.30 2107 144271
Now the procedure to find utilities using Certainty Equivalent Approach is given below.
1. Single-Criterion Utility Function for Project Cost
Upc (41000 M) = 0 (Worse) Upc (0 M) = 100 Best
Assume that Decision Makers consider Rs.20000 Million as indifference point
120 100 80 60 40 20 0
PKR. Millions
2. Single Criteria Utility Function for TT Savings (Rs. Millions)
Utt (0) = 0 (Worse) Utt (1022) = 100 (Best)
Assume that Decision Makers consider Rs. 500 Million as indifference point This Indicates Risk Taker Behavior
3. Single Criteria Utility Function for Crash Savings (Rs.Millions)
Ucr (0) = 0 (Worse ) Ucr (346.30) = 100 (Best)
Assume that Decision Makers consider Rs. 190 Million as indifference point
TT SAVINGS CRASH SAvings
150 100 50 0
PKR. Millions
0 10000 20000 30000 40000 50000
4. Single Criteria Utility Function for VOC Savings (Rs. Millions)
Uvoc (0 ) = 0 (Worse ) Uvoc (2107) = 100 Best
Assume that Decision Makers consider 765 Million as indifference point
VOC
120
100
80
60
40
20
0 © -500 0
500 1000 1500 2000 2500 3000 3500 4000 4500
PKR. Millions
5. Single Criteria Utility Function for Reduced Emissions (Tons)
Ure(0) = 0 (Worse ) Ure (144271) = 100 Best
Assume that Decision Makers consider 70000 Mg as indifference point
Reduced Emissions
120 100 80 60 40 20 0
20000 40000 60000 80000 100000 120000 140000 160000 —©—Reduced Emissions (Tons)
0
All the above-mentioned graphs are plotted by taking values of performance criterion on X axis while utility on Y axis. After plotting graphs, the scales of other performance criterion are hence measured. Each graph shown some functions of utilities with respect to the level of each performance criterion. The selection of best alternative using the additive utility function approach for amalgamation is calculated in the following table. Overall utility is the summation of each scaled values of a criterion multiplied with its respective normalized weights. This step involves the amalgamation or combination of all scaled and weighted performance criteria to determine the overall outcome of a transportation alternative and therefore to choose the best alternative. Scaled values for each performance criterion are shown in table 8 below.
1 Table 8: Scaled Values for Each Performance Criteria 1
Scaled Value
Project Cost Alternative ...... , (Rs.Millions) TT Savings (Rs. Millions) Crash Savings VOC (Rs. Millions) (Rs.Millions) Reduced Savings Emission (Tons)
A 100 B 0 C 18 0 90 100 0 0 85 63 100 100 0 74 100
The overall utility of each alternative is calculated by using the equation below
Utility= W (PC) x SC (PC) + W (TT) x SC (TT) + W (CR) x SC (CR) + W (VOC) x SC (VOC) + W (Emission) x SC (Emission)
Where
W = Normalized Weight of Criterion
Figure 11: Overall Utility Ranking for all three alternatives
Conclusions
The core of transportation decision making is the evaluation of transportation projects and programs in the context of available funding. For this reason, the principles and procedures of transportation project evaluation and programming are of interest to transportation engineers and planners, transportation agency administrators, facility managers and service providers, environmental groups, and the general public. This is a critical issue for governments everywhere. Each year, several trillions of dollars are invested worldwide in transportation facilities with a view to enhancing transportation system mobility, security, and safety, and to spurring economic development while minimizing environmental and other adverse impacts. Same is the case within Pakistan. This study provides indications of good practices that could be followed in the evaluation of alternatives transportation systems for the purpose of decision making, on the ground of demand estimation and Traffic on different segments, Travel Time Saving and Analysis that proved to be 2.535 Million PKR per day or 923.5 Million PKR per year, the Safety Cost Savings were around 292 Million PKR per year, the Vehicle Operating Saving Cost proved to be 1060 Million PKR per year. Similarly, the total Emission Reduction was around 1096447 Tons/Year.
The techniques that can be used to make decisions when there are multiple criteria with different dimensions, both monetary and non-monetary. The first task in multiple criteria evaluation is to assess how decision makers attach relative levels of importance (or weights) to these criteria. The study includes the review of Multi-Criterion Evaluation and Decision Making; carried out in accordance with pair-wise comparison performance, in which Analytical Hierarchy Process (AHP) was used to weight the corresponding alternatives. The next task in multi criteria evaluation is scaling where each criterion is converted from its original dimension to one that is uniform and commensurate across all performance criteria. In economic efficiency evaluation, for instance, the required common metric of measurement is monetary (Pakistani Rupees), and therefore performance criteria such as travel time, safety, and vehicle operating cost are expressed in monetary value. The value function approach is adopted when the decision making is carried out under the certainty scenario, whereas the utility function approach is used when the decision making is being carried out under the risk scenario. These scenarios and their various approaches to scaling. Finally, the study incorporates following conclusions which are given as under.
1. Rawalpindi Bypass will surely be reducing congestion on both case scenarios under consideration (base-case scenario and alternative scenarios both).
2. Rawalpindi Bypass's saving vehicle operating cost is estimated to be 1060 Million per year in accordance with 2015 constant PKR.
3. Saving Travel Time and its Analysis showed 4380 hours /year with the cost of 924 Million PKR / year will be saved after making this asset operational.
4. The Emissions Reduction is proved at 299 Tons/day.
5. The estimated Safety Cost Savings are around 292 Million PKR per year in this study.
6. This study provides indications of good practices that could be followed in the evaluation of alternatives transportation systems for the purpose of decision making.
7. Based on overall utilities, the alternative C which is Rawalpindi Bypass with 51 Km is best. The result shows that this alternative is best as compared to other alternatives based on criteria defined.
Citation information
Shakir, M. K., Khurshid, M. B., Iqbal, J., & Adeel, M. (2018). Multicriteria Decision Making (MCDM)
for evaluation of different transportation alternatives: A case of Rawalpindi bypass Pakistan. Journal of
Sustainable Development of Transport and Logistics, 3(3), 38-54. doi:10.14254/jsdtl.2018.3-3.3.
References
AASHTO. (2003). A Manual of User Benefit Analysis for Highways. 2nd Edition American Association of State Highway and Transportation Officials, Washington, D.C.
COMSIS Corporation, Scientific Applications International Corporation, Garman Associates. (1995). Development of diurnal traffic distribution and daily, peak and off-peak vehicle speed estimation procedures for air quality planning, Work Order B-94-06, Federal Highway Administration, U.S. Department of Transportation, Washington, DC.
Engineer Estimate of Hasanabdal-Havelian Section E-35.
Gwilliam, K. M. (1997). The value of time in economic evaluation of transport projects: Lessons from recent research. World Bank (Washington DC).
Planning Commission. (2004). Rawalpindi Bypass PC1.
Sinha, K. C., & Labi, S. (2011). Transportation decision making: Principles of project evaluation and programming. John Wiley & Sons.
Transportation Research Board. (2000). Highway Capacity Manual 2000. Transportation Research Board, Washington, D.C.
Williams-Derry, C. (2007). Increases in greenhouse-gas emissions from highway-widening projects. Sightline Institute, October.
World Health Organization (WHO). (2004). World Report on Road Traffic Injury Prevention. Washington, DC.
Xu, L., & Yang, J. B. (2001). Introduction to multi-criteria decision making and the evidential reasoning approach (pp. 1-21). Manchester: Manchester School of Management.
© 2016-2018, Journal of Sustainable Development of Transport and Logistics. All rights reserved.
This open access article is distributed under a Creative Commons Attribution (CC-BY) 4.0 license. You are free to:
Share - copy and redistribute the material in any medium or format Adapt - remix, transform, and build upon the material for any purpose, even commercially.
The licensor cannot revoke these freedoms as long as you follow the license terms. Under the following terms:
Attribution - You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use. No additional restrictions
You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Journal of Sustainable Development of Transport and Logistics (ISSN: 2520-2979) is published by Scientific Publishing House "CSR", Poland, EU and Scientific Publishing House "SciView", Poland, EU
Publishing with JSDTL ensures:
• Immediate, universal access to your article on publication
• High visibility and discoverability via the JSDTL website
• Rapid publication
• Guaranteed legacy preservation of your article
• Discounts and waivers for authors in developing regions
Submit your manuscript to a JSDTL at https://jsdtl.sciview.net/ or [email protected]
journal of Sustainable development of ®Tansport and Xogistics
$ sciemmc Plattom scltflewHei*