Evaluation of Customer Orientated Indices and Reliability Study of Electrical Feeder System
Aditya Tiwary1, Swati Tiwary2
!Dept. of Fire Technology & Safety Engineering, IPS Academy, Institute of Engineering and science, Rajendra Nagar, Indore (M.P), India [email protected] ^Entrepreneur, Vijay Nagar, Indore, India
Abstract
Reliability evaluation of a system or component or element is very important in order to predict its availability and other relevant indices. Reliability is the parameter which tells about the availability of the system under proper working conditions for a given period of time. The study of different reliability indices are very important considering the complex and uncertain nature of the power system. In this paper reliability evaluation of the electrical feeder system is presented. This paper also evaluates basic indices such as average failure rate, average outage time and average annual outage time. Along with basic indices, customer orientated indices such as system average interruption frequency index, system average interruption duration index and customer average interruption duration index of an electrical feeder system is also evaluated.
Keywords: Reliability, Availability, Electrical feeder system, average interruption frequency index, system average interruption duration index.
I. Introduction
Reliability evaluation of a system or component or element is very important in order to predict its availability and other relevant indices. Reliability is the parameter which tells about the availability of the system under proper working conditions for a given period of time. A Markov cut-set composite approach to the reliability evaluation of transmission and distribution systems involving dependent failures was proposed by Singh et al. [1]. The reliability indices have been determined at any point of composite system by conditional probability approach by Billinton et al. [2]. Wojczynski et al. [3] discussed distribution system simulation studies which investigate the effect of interruption duration distributions and cost curve shapes on interruption cost estimates. New indices to reflect the integration of probabilistic models and fuzzy concepts was proposed by Verma et al. [4].
Zheng et al. [5] developed a model for a single unit and derived expression for availability of a component accounting tolerable repair time. Distributions of reliability indices resulting from two sampling techniques are presented and analyzed along with those from MCS by Jirutitijaroen and Singh [6]. Dzobe et al. [7] investigated the use of probability distribution function in reliability worth analysis of electric power system. Bae and Kim [8] presented an analytical technique to evaluate the reliability of customers in a microgrid including distribution generations.
Reliability network equivalent approach to distribution system reliability assessment is proposed by Billinton and Wang [9].
Evaluation of Reliability indices accounting omission of random repair time for distribution systems using Monte Carlo simulation [10]. Determination of Optimum period between Inspections for Distribution system based on Availability Accounting Uncertainties in Inspection Time and Repair Time, Tiwary et al. [11]. Jirutitijaroen et al. [12] developed a comparison of simulation methods for power system reliability indexes and their distribution. Determination of reliability indices for distribution system using a state transition sampling technique accounting random down time omission Tiwary et al. [13].Tiwary et al. [14] proposed a methodology based on inspection repair based availability optimization of distribution systems using Teaching Learning based Optimization. Bootstrapping based technique for evaluating reliability indices of RBTS distribution system neglecting random down time was evaluated [15].
Volkanavski et al. [16] proposed application of fault tree analysis for assessment of the power system reliability. Li et al. [17] studies the impact of covered overhead conductors on distribution reliability and safety. Reliability enhancement of distribution system using Teaching Learning based optimization considering customer and energy based indices was obtained in Tiwary et al. [18]. Self-Adaptive Multi-Population Jaya Algorithm based Reactive Power Reserve Optimization Considering Voltage Stability Margin Constraints was obtained in Tiwary et al. [19]. A smooth bootstrapping based technique for evaluating distribution system reliability indices neglecting random interruption duration is developed [20]. The impact of covered overhead conductors on distribution reliability and safety is discussed [21]. Sarantakos et al. [22] introduced a method to include component condition and substation reliability into distribution system reconfiguration. Battu et al. [23] discussed a method for reliability compliant distribution system planning using Monte Carlo simulation.
Tiwary et al. [24] has discussed a methodology for reliability evaluation of an electrical power distribution system, which is radial in nature. Uspensky et al. [25] has developed a method for reliability assessment of the digital relay protection system. The paper established the load peak valley partition model and demand response model corresponding to every period based on load peak-valley characteristics [26]. A probabilistic method to assess the reliability impact of EVs penetration is discussed [27]. A BN-based unified modeling method for performance and reliability is proposed [28]. A framework for dynamic prediction of reliability weaknesses in power transmission systems based on imbalanced data is discussed [29]. Pham et al. [30] proposed a method for reliability evaluation of an aggregate battery energy storage system in microgrids under dynamic operation. Min et al. [31] proposes a research framework to evaluate the new policy in South Korea from various aspects using three simulation models in a series.
Ding et al. [32] presents a technique to evaluate reliability of a restructured power system with a bilateral market. Oh et al. [33] proposes a new methodology for a probabilistic power system reliability evaluation using a Monte Carlo simulation in case of multi-energy storage system installed at wind farms. Shrestha et al. [34] proposed the development of an operational adequacy evaluation framework for operational planning of bulk electric power systems. Gautam et al. [35] proposed the development and integration of momentary event models in active distribution system reliability assessment. Adinolfi et al. [36] proposed a multiobjective optimal design of photovoltaic synchronous boost converters assessing efficiency, reliability, and cost savings. Tiwary et al. [37] has discussed a methodology for evaluation of customer orientated indices and reliability of a meshed power distribution system.
Evaluation of different reliability indices are important for proper working of the distribution system. This paper provides a detailed study of different reliability indices of importance. Reliability of each and every distribution system and load point is been obtained. This paper also provides the value of the three basic reliability index along with the customer oriented reliability indices.
II. Reliability evaluation of series system
Physically a system configuration will be a series reliability network if system fails even if a single component fails or system survives if all the components are working successfully.
The system is having a constant failure rate and therefore the reliability of the system having constant failure rate is evaluated by using the following relation.
R(t) — e-xt (1)
Where R(t) represents the reliability of each distribution section. X represents the failure rate per year and t represents time period which is taken as one year.
If one assumes reliability of each component as r1,r2...rn, then reliability of series system (Rs) is given as
Rs = Uri (2)
Where ri represents the reliability of components from i=1....n.
III. Basic reliability indices evaluation of series system
When series system with respect to reliability studies are concerns, three basic reliability parameters are average failure rate, average outage time and average annual outage time, which are mentioned as follows.
As=£Ai (3)
Us=£ [Ai.ri] (4)
rs=£Airi)/(£Ai) (5)
Where Ai is failure rate per year
ri is average repair time, hours
IV. Customer orientated indices evaluation of series system
Customer orientated indices related to reliability studies are system average interruption frequency index, system average interruption duration index and customer average interruption duration index, which are mentioned as follows.
System average interruption frequency index (SAIFI)
„ . total number of customer interruptions
SAIFI —--(6)
total number of customers served
System average interruption duration index (SAIDI)
CATr.j _ sum of customer interruption durations
SnlMl — (/ )
total number of customers
Customer average interruption duration index (CAIDI)
^.at^t sum of customer interruption durations
CAIDI —------(8)
total number of customer interruptions
V. Results and Discussions
Eight node radial distribution system consists of 7 distributor segments and 7 load points from LP-2 to LP-8 Fig. 1,[4].
Table 1 [4] provides the initial data for the radial distribution system. Table 1 consists of failure rate per year and repair time in hours of each distribution section from 1 to 7 of the radial distribution system. Table 2 consists of number of customers at each load point LP-2 to LP-8.
Table 1. Initial data for the radial distribution system [4]
Distribution Section 1 2 3 4 5 6 7
A, failure/year 0.4 0.2 0.3 0.5 0.2 0.1 0.1
r, Average repair time, hours 10 9 12 20 15 8 12
Table 2. Initial data for the load points
Load Point 2 3 4 5 6 7 8
Number of customers 1000 800 600 800 500 400 300
Evaluated Reliability at each distribution section is provided in Table 3. The reliability at each distribution section is evaluated by using equation 1. Fig.2 provides magnitude of reliability at different distribution sections.
Table 3 Evaluated Reliability at each distribution section
Distribution Section Reliability
1 0.6703
2 0.8187
3 0.7408
4 0.6065
5 0.8187
6 0.9048
7 0.9048
Fig. 2 Magnitude of Reliability at different distribution sections.
Table 4 gives the calculated value of the reliability at each and every load point of the radial distribution system. The reliability at each and every load point is obtained by using the equation 2. Fig.3 provides magnitude of reliability at different load points of the distribution system.
Table 4 Evaluated Reliability at each load points
Load point Reliability
2 0.6703
3 0.5488
4 0.4065
5 0.4065
6 0.3328
7 0.4965
8 0.4492
Fig. 3 Magnitude of Reliability at different Load Points.
Basic reliability indices at each load point i.eaverage failure rate, average outage time and average annual outage time are evaluated are presented in Table 5.
Customer orientated indices such as system average interruption frequency index (SAIFI) is evaluated as 0.7295, system average interruption duration index (SAIDI) is obtained as 8.8545 and customer average interruption duration index (CAIDI) is evaluated as 12.1371 for the radial distribution system.
Table 5 Evaluated Basic Reliability indices at each load points
Load point 2 3 4 5 6 7 8
average failure rate 0.4 0.6 0.9 0.9 1.1 0.7 0.8
average outage time 10 9.67 10.4 15.56 15.45 9.42 9.75
average annual outage time 4 5.8 9.4 14 17 6.6 7.8
VI. Conclusion
Evaluation of reliability and other indices related to it are very important for a power distribution system. In this paper a radial distribution system is taken in consideration for the study of different reliability parameters. Reliability of each and every distribution section is obtained for the radial distribution system. For each and every load point considered the value of the reliability is evaluated for the distribution system considered. The three basic reliability parameters of importance average failure rate, average outage time and average annual outage time are also obtained for the load points considered. Important customer orientated indices such as system average interruption frequency index, system average interruption duration index and customer average interruption duration index are also evaluated for the radial distribution system.
References
[1] C. Singh. (1981). Markov cut-set approach for the reliability evaluation of transmission and distribution systems. IEEE Trans. on Power Apparatus and Systems, 100: 2719-2725.
[2] R. Billinton. (1969). Composite system reliability evaluation. IEEE Trans. on Power Apparatus and Systems, 88:276-281.
[3] E. Wojczynski, R. Billinton. (1985). Effects of distribution system reliability index distributions upon interruption cost/reliability worth estimates. IEEE Trans. on Power Apparatus and Systems, 11:3229-3235.
[4] A. K. Verma, A. Srividya, H. M. R. Kumar. (2002). A framework using uncertainties in the composite power system reliability evaluation. Electric Power Components and Systems, 30:679-691.
[5] Z. Zheng, L. Cui, Alan G. Hawkes. (2006). A study on a single-unit Markov repairable system with repair time omission. IEEE Trans. on Reliability, 55:182-188.
[6] P. Jirutitijaroen, C. singh. (2008). Comparison of simulation methods for power system reliability indexes and their distributions. IEEE Trans. on Power Systems, 23:486-493.
[7] O. Dzobe, C. T. Gaunt, R. Herman. (2012). Investigating the use of probability distribution functions in reliability-worth analysis of electric power systems. Int. J. of Electrical Power and Energy Systems, 37:110-116.
[8] I. S. Bae, J. O. Kim. (2008). Reliability evaluation of customers in a microgrid.IEEE Trans. on Power Systems, 23:1416-1422.
[9] R. Billinton, P. Wang. (1998). Reliability-network-equivalent approach to distribution-system-reliability evaluation. IEE Proc. generation, transmission and distribution, 145:149-153.
[10] L. D. Arya, S. C. Choube, R. Arya and AdityaTiwary. (2012). Evaluation of Reliability indices accounting omission of random repair time for distribution systems using Monte Carlo simulation. Int. J. of Electrical Power and Energy System, (ELSEVIER), 42:533-541.
[11] AdityaTiwary, R. Arya, S. C. Choube and L. D. Arya.(2012). Determination of Optimum period between Inspections for Distribution system based on Availability Accounting Uncertainties in Inspection Time and Repair Time. Journal of The Institution of Engineers (India): series B (Springer), 93:67-72.
[12] Jirutitijaroen P, singh C. (2008).Comparison of simulation methods for power system reliability indexes and their distribution. IEEE Trans Power Syst, 23:486-92.
[13] AdityaTiwary, R. Arya, S. C. Choube and L. D. Arya.(2013). Determination of reliability indices for distribution system using a state transition sampling technique accounting random down time omission. Journal of The Institution of Engineers (India): series B (Springer), 94:7183.
[14] AdityaTiwary, L. D. Arya, R. Arya and S. C. Choube. (2016). Inspection repair based availability optimization of distribution systems using Teaching Learning based Optimization. Journal of The Institution of Engineers (India): series B (Springer), 97:355-365.
[15] AdityaTiwary, R. Arya, L. D. Arya and S. C. Choube. (2017). Bootstrapping based technique for evaluating reliability indices of RBTS distribution system neglecting random down time. The IUP Journal of Electrical and Electronics Engineering, X:48-57.
[16] Volkanavski, Cepin M, Mavko B. (2009).Application of fault tree analysis for assessment of the power system reliability.ReliabEngSyst Safety, 94:1116-27.
[17] Li BM, Su CT, Shen CL. (2010).The impact of covered overhead conductors on distribution reliability and safety.Int J Electr Power Energy Syst, 32:281-9.
[18] AdityaTiwary. (2017). Reliability enhancement of distribution system using Teaching Learning based optimization considering customer and energy based indices. International Journal on Future Revolution in Computer Science & Communication Engineering, 3:58-62.
[19] AdityaTiwary. (2018). Self-Adaptive Multi-Population Jaya Algorithm based Reactive Power Reserve Optimization Considering Voltage Stability Margin Constraints. International Journal on Future Revolution in Computer Science & Communication Engineering, 4:341-345.
[20] R. Arya ,AdityaTiwary , S. C. Choube and L. D. Arya. (2013). A smooth bootstrapping based technique for evaluating distribution system reliability indices neglecting random interruption duration. Int. J. of Electrical Power and Energy System, (ELSEVIER), 51:307-310.
[21] M. BinLi, C. TzongSu, C. LungShen. (2010). The impact of covered overhead conductors on distribution reliability and safety. Int. J. of Electrical Power and Energy System, (ELSEVIER), 32:281-289.
[22] I. Sarantakos, D. M.Greenwood, J.Yi, S. R. Blake, P. C. Taylor. (2019). A method to include component condition and substation reliability into distribution system reconfiguration. Int. J. of Electrical Power and Energy System, (ELSEVIER), 109:122-138.
[23] N. R. Battu, A. R. Abhyankar, N. Senroy. (2019). Reliability Compliant Distribution System Planning Using Monte Carlo Simulation. Electric power components and systems, 47:985-997.
[24] AdityaTiwary. (2019). Reliability evaluation of radial distribution system - A case study. Int. J. of Reliability: Theory and Applications, 14,4(55):9-13.
[25] Michael Uspensky. (2019). Reliabilityassessmentof the digital relay protection system. Int. J. of Reliability: Theory and Applications, 14:10-17.
[26] N. Li, X. Wang, Z. Zhu, Y. Wang. (2019). The reliability evaluation research of distribution system considering demand response. The 6th International Conference on Power and Energy Systems Engineering (CPESE 2019). Okinawa. Japan.
[27] M. P. Anand, B. Bagen, A. Rajapakse. (2020). Probabilistic reliability evaluation of distribution systems considering the spatial and temporal distribution of electric vehicles. Int. J. of Electrical Power & Energy Systems. 117.
[28] Yi Ren, B. Cui, Q. A. Feng, D. Yang, D. Fan, Bo Sun, M. Li. (2020). A reliability evaluation method for radial multi-microgrid systems considering distribution network transmission capacity. Computers & Industrial Engineering.139.
[29] C. Sun, X. Wang, Y. Zheng, F. Zhang. (2020). A framework for dynamic prediction of reliability weaknesses in power transmission systems based on imbalanced data. Int. J. of Electrical Power & Energy Systems. 117.
[30] T. T. Pham, T. C. Kuo, D. M. Bui. (2020). Reliability evaluation of an aggregate battery energy storage system in microgrids under dynamic operation. Int. J. of Electrical Power & Energy Systems. 118.
[31] D. Min, J. H. Ryu, D. G. Choi. (2020). Effects of the move towards renewables on the power system reliability and flexibility in South Korea. Energy Reports. 6:406-417.
[32] Y. Ding, P. Wang, L. Goel, R. Billinton, R. Karki. (2007). Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques. Electric Power Systems Research. 77:1665-1671.
[33] U. Oh, Y. Lee, J. Choi, R. Karki. (2019). Reliability evaluation of power system considering wind generators coordinated with multi-energy storage systems. IET Generation, Transmission & Distribution. 14.
[34] T. K. Shrestha, R. Karki, P. Piya. (2020). Development of an operational adequacy evaluation framework for operational planning of bulk electric power systems. International Journal of Reliability, Quality and Safety Engineering.
[35] P. Gautam, P. Piya, R. Karki. (2019). Development and integration of momentary event models in active distribution system reliability assessment. IEEE Transactions on Power Systems.
[36] G. Adinolfi, G. Graditi, P. Siano, A. Piccolo. (2015). Multiobjective optimal design of photovoltaic synchronous boost converters assessing efficiency, reliability, and cost savings. IEEE Transactions on Industrial Informatics. 11.
[37] Aditya Tiwary. (2020). Customer orientated indices and reliability evaluation of meshed power distribution system. Int. J. of Reliability: Theory and Applications, 15,1(56):10-19.
Received: June 08, 2020 Accepted: September 10, 2020